Turnkey bathroom renovation

Six trades, one planning, and the day you shower again written in the quote.

We plan every trade so they follow each other without gaps. You have one contact, from the first measurement to the handover.

Get my planning and quote

Example: complete bathroom, 5 m²

Handover

Day123456789101112RemovalPlumbingElectricsWaterproofingTilingFitting

What is ticked off before we start

One contact for every trade

Plumber, tiler, electrician, joiner: we plan them and answer for all of them. You call one number, not four.

A fixed date to shower again

Start date, end date and the days the room is out of use, written in the quote. We keep to them.

Waterproofing done properly

A waterproofing membrane under every walk-in shower and around the bath, before the first tile. It is where leaks start.

Insured, and guaranteed

Ten-year insurance on waterproofing and the work on the building, two years on fitted equipment, one year to put anything right.

Delivered on the planned day

Recent bathrooms in the area, photographed on handover day.

White marble bathroom

Marble-effect porcelain, black fittings

Lille, 2026

12 days

Double vanity and gold fittings

Large-format porcelain, brushed brass

Marcq-en-Barœul, 2026

15 days

Warm beige shower room

Matt porcelain, oak vanity

Villeneuve-d'Ascq, 2025

10 days

Cement tiles and black frame

Cement tiles, white wall tiles

Roubaix, 2025

9 days

Green tiles and terrazzo floor

Glazed tiles, terrazzo

Lambersart, 2025

11 days

Grey shower and wooden vanity

Stone-effect porcelain, walnut vanity

Tourcoing, 2024

13 days

The project in four lines

1Measuring visit

We measure the room, check pipes, drain, ventilation and electrics, and talk about how you use it.

2Plan and written quote

A layout and 3D views, the tiles and fittings chosen with you, each trade and each day written in the quote.

3Removal and networks

The old bathroom taken out, water, drains and electrics brought to the new layout, waterproofing laid.

4Tiling, fitting, handover

Tiles, fittings and furniture in place, everything tested, the room cleaned, then a walk-through together.

Good to know before you start

10 % VAT in a home over two years old

Labour and the equipment we supply and fit are invoiced at 10 %. New homes and business premises: 20 %.

Adapting a bathroom can be part-funded

MaPrimeAdapt' from the Anah can fund part of the work for people over 70, or from 60 in loss of autonomy, or with a disability, under income conditions. Apply before the work starts.

Water and electricity, kept apart

Around the bath and shower, safety zones forbid sockets, except a shaver point, and every circuit is protected at 30 mA. We check it before tiling.

In a flat, the drain decides

A level-access shower needs a fall to the drain. We check it at the visit, and anything touching the shared pipes goes through the building manager.

"Twelve working days, as written. I only ever had one person on the phone, and he knew where every trade was."
Valérie G.Complete bathroom, house
"They replaced my mother's bath with a level shower and grab bars, and helped us with the MaPrimeAdapt' file."
Philippe M.Adapted bathroom
"A shower room under the roof in three square metres. Nothing bumps, everything closes, and it does not steam up."
Julie et Samir A.Attic shower room

Ask for a free bathroom quote

Tell us where, roughly how big, and what you would like. We call you back to arrange the measuring visit.

Rather talk about it? Call us:01 23 45 67 89